Shotmed (شوتمد) was founded in 1948 by Mr. Shoukri Salama as Salama Trading, the company focused on the trading of local grain along with importing and trading spices from the Sudan and Yemen. Mr. Salama conducted business through his legacy of: “quality goods at minimal cost in the least time”.
Engineering, fabrication, and construction of complete grain silo with capacity 3,500 MT including conveying system with capacity 70 MT/hour, dust filters cyclone, and PLC SCADA control system.
MoreEngineering and fabrication of complete grain silo with capacity 5,000 m3 including conveying system with capacity 50 MT/hour, dust filters cyclone, PLC SCADA control system. Scope included earth works, plain and reinforced concrete pouring, and piles.
MoreEngineering, procurement, fabrication, and construction of grain silo with storage capacity 120,000 MT, flat warehouse of 20,000 MT capacity, conveying system with a capacity of 700 and 1,400 MT/hour. Scope included earth and civil works.
MoreEngineering, fabrication, and construction of complete grain silo with capacity 10,000 MT including conveying system with capacity 150 MT/hour, dust filters cyclone, PLC SCADA control system.
MoreEngineering, procurement, fabrication, and construction of molasses tank 20,000 MT capacity including charge pipes, civil works, and electromechanical works.
MoreEngineering, procurement, fabrication, and construction of reception, washing, and slicing equipment (belt conveyor, screw conveyor, steel structure, chutes, hoppers, and other parts).
MoreEngineering, procurement, fabrication, and construction of two vegetable oil tanks total capacity of 30,000 MT.
MoreEngineering, fabrication, procurement, and construction of complete grain silo with capacity 20,000 MT including conveying system with capacity 200 MT/hour, dust filters cyclone, PLC SCADA control system.
MoreDetailing, procurement, and fabrication of steel structure (covering area of 5000 m2, 25 m free span), one carbon steel service water tank with a capacity of 2000 m3.
MoreEngineering, civil work, fabrication, and construction of steel structure for Youssef El Sediek cattle farm (18,000 head).
Total Earth Works: 500,000 m3
Total Concrete Poured: 3,000 m3
Detailing, fabrication, and installation of mechanical structures and installation of equipment for Sinai cement factory.
MoreEngineering, fabrication, procurement, and construction of preheater tower and kiln for Beni Suef cement factory.
MoreOverhauling of 18 Archimedean screws with 3 m diameter (replacing of flights, specialized epoxy coating) scope included replacing seven 280 KW electrical motors and gearboxes, and upgrading of control system.
MoreEngineering, procurement, fabrication, and construction of complete paper mill, scope included earth and civil works, administration buildings MEP and finishing, steel structure for process hall (including overhead crane, HVAC systems, firefighting alarm), and installation of two complete bond paper machine lines with all electromechanical and control systems. All auxiliary installations (compressor, boilers, etc...)
MoreProcurement, fabrication, and construction of main factory building, warehouses facility, and management buildings. Scope included installation of steam ventilation systems, water and sewage systems, and water desalination and purification units.
MoreFabrication and surface treatment of subsea and topside steel structure offshore platform structure. Scope included RT on 50%, UT on 70%, and VT on 100% of welds.
MoreEngineering, procurement, fabrication, construction of dry port container handling complex. Scope included earth and civil works for roads and buildings, installation of internal railway systems, main terminal steel structure (covering area 10,000 m2, 50 m free span with all MEP works), administrative building (3 stories including all MEP and finishing works), carbon steel tank farm 30,000 MT capacity with all auxiliary pumps and piping, hard top was 30,000 m2, and perimeter fences and gates.
MoreProcurement, fabrication, and installation of 187 new steel buoys complete with: radar reflectors, marine lanterns with drum lens 3-6 nautical mile visibility, stationary navigation aids, scope included river dredging in some parts.
MoreEngineering, procurement, fabrication, and construction of main tuner factory. Scope included earth and civil works, fabrication of steel structure, electromechanical works, MEP, and HVAC.
MoreManufacture, supply, and erection of carbon steel storage tanks. Scope included insulation and pipes for carbon black factory.
MoreEngineering, procurement, fabrication, and construction of steel structure for turbine building, granulation unit, sulfuric acid plant, potassium plant, super phosphate plant. Installation of equipment for phosphate plant, granulation unit (five belt conveyors), dryer, and radiator units.
Total Conveyor Length: 450 Lm
Procurement, fabrication, and construction of complete steel structure for glass kiln for glass bottle factory.
MoreEngineering, fabrication, and installation of all steel structure for PVC process manufacture building including pipe rack, reactor building, boiler building, 25 KG bagging station building ,and control building.
MoreEngineering, fabrication, procurement, and construction of two carbon steel Mazout fuel storage tank, one carbon steel diesel fuel tank, two epoxy lined carbon steel desalinated water tanks, two stainless steel condensate water tanks. Scope included earth works; plane and reinforced tanks concrete foundation, all provision (fire alarm and fighting equipment, valves, access hole, and stair case guards).
Total Earth Works: 4,500 m3
Total Concrete Pouring: 850 m3
Engineering, fabrication, procurement, and construction of main factory hall. Scope included earth and civil works for steel structure and machinery, MEP and HVAC installations (feed water, drain, compressed air, electrical power and lighting networks, low current networks), medium voltage boards, MCC and PLC. Instruments calibration and pre-commissioning.
Total Earth works: 250,000 m3
Total Concrete Poured: 4,500 m3
Construction of steel structure of the main hall, food court, stiletto wall.
MoreEngineering, fabrication, and construction of main campus building. Scope included steel structure, metal deck and cladding, MEP works and finishing.
MoreEngineering, fabrication, procurement, and construction of material warehouse. Scope included earth and civil works, steel structure, electromechanical installation (mechanical works, sewage, water, HVAC).
Total Earth Works: 1,200 m3
Total Concrete Pouring: 450 m3