Shotmed (شوتمد) was founded in 1948 by Mr. Shoukri Salama as Salama Trading, the company focused on the trading of local grain along with importing and trading spices from the Sudan and Yemen. Mr. Salama conducted business through his legacy of: “quality goods at minimal cost in the least time”.  

READ MORE

FABRICATION

Modernised steel fabrication equipment

Read More

CONSTRUCTION

Latest lifting equipment, construction machinery, and tools

Read More

OUR PROJECTS

Chicken Feed Silo Storage

Agriculture

Engineering, fabrication, and construction of complete grain silo with capacity 3,500 MT including conveying system with capacity 70 MT/hour, dust filters cyclone, and PLC SCADA control system.

More

Grain Silo Project

Agriculture

Engineering and fabrication of complete grain silo with capacity 5,000 m3 including conveying system with capacity 50 MT/hour, dust filters cyclone, PLC SCADA control system. Scope included earth works, plain and reinforced concrete pouring, and piles.

More

Dekhila Port Grain Handling Facility

Agriculture

Engineering, procurement, fabrication, and construction of grain silo with storage capacity 120,000 MT, flat warehouse of 20,000 MT capacity, conveying system with a capacity of 700 and 1,400 MT/hour. Scope included earth and civil works.

More
Total Weight

2,500 MT

Damanhour Grain Storage

Agriculture

Engineering, fabrication, and construction of complete grain silo with capacity 10,000 MT including conveying system with capacity 150 MT/hour, dust filters cyclone, PLC SCADA control system.

More

Molasses Tank Project

Sugar

Engineering, procurement, fabrication, and construction of molasses tank 20,000 MT capacity including charge pipes, civil works, and electromechanical works.

More
Total Weight

780 MT

Process Building Project

Sugar

Engineering, procurement, fabrication, and construction of reception, washing, and slicing equipment (belt conveyor, screw conveyor, steel structure, chutes, hoppers, and other parts).

More
Total Weight

1,950 MT

Damietta Tank Farm Facility

Food Processing

Engineering, procurement, fabrication, and construction of two vegetable oil tanks total capacity of 30,000 MT.

More
Total Weight

850 MT

Albadrain Grain Silo Project

Food Processing

Engineering, fabrication, procurement, and construction of complete grain silo with capacity 20,000 MT including conveying system with capacity 200 MT/hour, dust filters cyclone, PLC SCADA control system.

More

Factory Extension

Food Processing

Detailing, procurement, and fabrication of steel structure (covering area of 5000 m2, 25 m free span), one carbon steel service water tank with a capacity of 2000 m3.

More
Total Weight

435 MT

Youssef Elsediek Cattle Fattening Farm (18,000 Head)

Food Processing

Engineering, civil work, fabrication, and construction of steel structure for Youssef El Sediek cattle farm (18,000 head).
Total Earth Works: 500,000 m3
Total Concrete Poured: 3,000 m3

More
Total Weight

5,000 MT

Cement Factory Extension

Cement

Detailing, fabrication, and installation of mechanical structures and installation of equipment for Sinai cement factory.

More
Total Weight

1,123 MT

Preheater Kiln Project

Cement

Engineering, fabrication, procurement, and construction of preheater tower and kiln for Beni Suef cement factory.

More
Total Weight

4,000 MT

Al Kalag Station Upgrade

Water Treatment and Management

Overhauling of 18 Archimedean screws with 3 m diameter (replacing of flights, specialized epoxy coating) scope included replacing seven 280 KW electrical motors and gearboxes, and upgrading of control system.

More

October Division Mill Project

Pulp and Paper

Engineering, procurement, fabrication, and construction of complete paper mill, scope included earth and civil works, administration buildings MEP and finishing, steel structure for process hall (including overhead crane, HVAC systems, firefighting alarm), and installation of two complete bond paper machine lines with all electromechanical and control systems. All auxiliary installations (compressor, boilers, etc...)

More

Factory and Warehouse Construction

Textile

Procurement, fabrication, and construction of main factory building, warehouses facility, and management buildings. Scope included installation of steam ventilation systems, water and sewage systems, and water desalination and purification units.

More

Subsea and Topside Steel Structure Kamose Development Field

Oil and Gas

Fabrication and surface treatment of subsea and topside steel structure offshore platform structure. Scope included RT on 50%, UT on 70%, and VT on 100% of welds.

More
Total Weight

150 MT

Bashteel Dry Port

Transportation

Engineering, procurement, fabrication, construction of dry port container handling complex. Scope included earth and civil works for roads and buildings, installation of internal railway systems, main terminal steel structure (covering area 10,000 m2, 50 m free span with all MEP works), administrative building (3 stories including all MEP and finishing works), carbon steel tank farm 30,000 MT capacity with all auxiliary pumps and piping, hard top was 30,000 m2, and perimeter fences and gates.

More

Marine Line Upgrade (Aswan – Wadi Hilafa)

Transportation

Procurement, fabrication, and installation of 187 new steel buoys complete with: radar reflectors, marine lanterns with drum lens 3-6 nautical mile visibility, stationary navigation aids, scope included river dredging in some parts.

More

Tuner Factory Project

Telecommunications

Engineering, procurement, fabrication, and construction of main tuner factory. Scope included earth and civil works, fabrication of steel structure, electromechanical works, MEP, and HVAC.

More
Total Weight

620 MT

Alex Carbon Black Line Extension

Chemical and Fertilizer

Manufacture, supply, and erection of carbon steel storage tanks. Scope included insulation and pipes for carbon black factory.

More
Total Weight

2,175 MT

NCIC Factory Extension

Chemical and Fertilizer

Engineering, procurement, fabrication, and construction of steel structure for turbine building, granulation unit, sulfuric acid plant, potassium plant, super phosphate plant. Installation of equipment for phosphate plant, granulation unit (five belt conveyors), dryer, and radiator units.
Total Conveyor Length: 450 Lm

More
Total Weight

1,150 MT

Glass Kiln Project

Chemical and Fertilizer

Procurement, fabrication, and construction of complete steel structure for glass kiln for glass bottle factory.

More
Total Weight

210 MT

PVC Process Buildings

Chemical and Fertilizer

Engineering, fabrication, and installation of all steel structure for PVC process manufacture building including pipe rack, reactor building, boiler building, 25 KG bagging station building ,and control building.

More
Total Weight

3,500 MT

Ain Sukhna Power Plant

Energy and Power Generation

Engineering, fabrication, procurement, and construction of two carbon steel Mazout fuel storage tank, one carbon steel diesel fuel tank, two epoxy lined carbon steel desalinated water tanks, two stainless steel condensate water tanks. Scope included earth works; plane and reinforced tanks concrete foundation, all provision (fire alarm and fighting equipment, valves, access hole, and stair case guards).
Total Earth Works: 4,500 m3
Total Concrete Pouring: 850 m3

More
Total Weight

1,991 MT

El Minya Marble Factory

Mining and Heavy Metals

Engineering, fabrication, procurement, and construction of main factory hall. Scope included earth and civil works for steel structure and machinery, MEP and HVAC installations (feed water, drain, compressed air, electrical power and lighting networks, low current networks), medium voltage boards, MCC and PLC. Instruments calibration and pre-commissioning.
Total Earth works: 250,000 m3
Total Concrete Poured: 4,500 m3

More
Total Weight

1,200 MT

Grand Egyptian Museum

Commercial Structures

Construction of steel structure of the main hall, food court, stiletto wall.

More
Total Weight

8,400 MT

Chinese University in Egypt

Commercial Structures

Engineering, fabrication, and construction of main campus building. Scope included steel structure, metal deck and cladding, MEP works and finishing.

More
Total Weight

650 MT

Warehouse Storage Project

Industrial

Engineering, fabrication, procurement, and construction of material warehouse. Scope included earth and civil works, steel structure, electromechanical installation (mechanical works, sewage, water, HVAC).
Total Earth Works: 1,200 m3
Total Concrete Pouring: 450 m3

More
Total Weight

700 MT

VIEW ALL PROJECTS

JOIN OUR TEAM

Shotmed's most important asset is our team. If you would like to join our team please click here to send us your updated CV.

APPLY NOW

LATEST NEWS

VIEW ALL
November 27, 2022

Shotmed Signs MOU with Arab Organization for Industrializiation

READ MORE
February 15, 2021

Shotmed Company Launches New Website

READ MORE

Looking for Excellence, Efficiency & Integrity

Contact Us